CBS Issues

1-Second 6×6 was added next to each existing one to better align posts with columns, two examples

2-Hat Channel still has to be installed on cielings two feet apart so sheetrock can be hung

2-Hat channel on some pieces is not secured in the corners

2-Hat Channel in others corners is secured properly.

2- Hat channel is centered at 80″ from subfloor, it should be 96″ to align with sheetrock

2- It’s inconsistent, here its at 90″, 96″ is where the tape bends.

2-Here are two examples of hat channel that is not level.

3-This X isn’t pinned in the center.

3-One X is pinned in the center, the other is not.

4-Trim is buckling at the bottom.

4-Facia trim is buckled resulting in a gap

Why has this foam been removed?